Passing EMC Tests Starts Even Before The Design Phase.
Most engineers wait until the testing phase to worry about EMC compliance.
Big mistake.
By then, your options are limited to expensive fixes and last-minute hacks.
Here’s a simple way to start: Keep the current loop as small as possible.
Smaller loops → Smaller fields → Lower emissions.
It’s not exciting work.
It’s not glamorous.
But it works.
Every time.
The goal? Reduce uncontrolled fields before they become a problem.
Start simple. Nail the basics. Build from there.
- Dario
P.S. Need more EMI training?
See if you qualify → fresuelectronics.com
20 Views